TFP employees fertilizing sprigs |
#12 golf hole |
#12 green |
#11 golf hole |
#11 green complex, 12 golf hole and 13 tee |
Sprigs being watered at 13 golf hole |
#13 tee complex with sprigs installed and tee surrounds sodded |
12 green |
12 green |
Sprigs being planted on 13 tee |
TFP employee, Ed, watering 12 green surround while being watched |
A sprig hand planter |
Irrigation heads watering the sprigs at 13 |
Laser leveling the tee at the practice facility |
Laser leveling the tee at the practice facility |
#10 tee complex and surround ready for sod and sprigs |
#7 tee |
The littoral shelf being installed at 7 golf hole on Lake Sterling |
The sprigs at 7 tee growing |
The littoral shelf installation at 7 |
Sprigs growing in the fairway at 7 |
Sprigs growing on 8 tee |
#8 tee complex |
Sun bathing |
#9, 5 Par |
Second shot at 9 |