| TFP employees putting the first mow on the sod at 7 golf hole. |
| Mowing the sod at #7 waste area. |
| A look at the Celebration sprigs. |
| Sprig installation at 7 tee. |
| Sod at the staging area. |
| The sprig tractor planting #7 golf hole. |
| A look at the sprigs "cut-in" at #7 golf hole |
| Heavy activity this Saturday at 11 golf hole with seepage installation and green surround prep. |
| These 3 little guys are occupying their own private section of the back nine wetlands. |
| A better look at this young gator measuring 5 inches. |
| The green complex at 13 golf hole under sod. |
| Sprigs growing at 9 golf hole. |
| 20 year TFP employee, irrigation technician, John Warren checks every irrigation head for proper function. |
| The cart path at 5 has been installed. |
| A close look at the sprigs on 7 fairway. |
| 9 tee complex and tee-shoot sodded and sprigged. |
| #8 golf hole growing in. |