May 22, 2013
For overseeded golf courses throughout the southern USA, the
arrival of warmer weather signifies the start of “turfgrass transition.”
Starting around June 1st, the golf course will begin to lose its ryegrass
overseed due to the increased temperatures and the start of more aggressive
cultural practices.
The perennial ryegrass, a cool season grass, cannot
withstand the summer heat, and will ultimately die. Our base turfgrass,
bermudagrass, will slowly begin to reappear in the place of the ryegrass… hence
the term, “transition.”
By forcing a transition from ryegrass to bermudagrass this
summer, the odds of eradicating the undesirable mutations and contaminations
that have consumed much of the course throughout the past 30 years will be
increased. Basically, the less of the old grass still on the ground in the
summer of 2013, the better the odds are that the new grasses planted in 2014
will not be contaminated.
To aid in transition, mowing heights are lowered on the primary roughs. Over the
course of the next several weeks, large voids of grass cover will be noticeable
until the bermudagrass crawls over the entire landscape.
Some areas of the course will transition better than others.
In fact, the areas that will transition most poorly will be high traffic areas,
such as where carts and mowers concentrate. Transition will also be compromised
at areas that receive significant shade throughout the course of the day. The
transition process is typically complete by the second or third week of July.
The removal of several trees casting long periods of shade
and blocking valuable sunlight in specific locations on the front 9 will begin
in early June. This work is scheduled to be completed by August in preparation
for the start of the restoration project in October. The final pre-construction
phase of the restoration is Bermudagrass eradication, which will commence in
early August. More information on this phase will be featured in the next issue
of PMP News.
 |
|
A computer generated model demonstrates a significant
improvement in sunlight duration after the removal of several trees near
Fairway #6. Harvesting the correct trees will result in nearly 4–4.5 hours of
additional sunlight for the fairway grass.
|
 |
|
The golf course will be open for play throughout the summer
and fall, until construction begins on September 30. This photo shows what the
course will look like when the Bermudagrass eradication program begins in early
August.
|
Several ornamental crape myrtles and small magnolias that
have been marked for removal by the golf course architect are being offered in
an adoption program to Members. For a fee, the adoption program includes
spading the trees and relocating them. Members, in conjunction with a preferred
contractor, will be responsible for the execution of the transplant.
The golf course will be open for play throughout the summer and fall,
until construction begins on September 30.