The Bermudagrass Eradication Program


During the months of August through September, the golf course maintenance department will be completing the final stage of “preconstruction conditioning” required before the start of the restoration project beginning in October. The final stage, “the bermudagrass eradication phase”, is the most critical of all preconstruction stages. Basically, this means we will be killing the existing turfgrass plants on the course.

Eradicating the existing bermudagrass base of turfgrass is critical for two reasons. First, it will allow for easier more effective tilling and shaping of the golf course. By killing the turf and associated root mass, the decomposition of organic matter or “carpet of grass” will be accelerated. As a result, soil tillers, bulldozers and other earthmoving equipment will be able to shape, move and create the restored golf course free of large chunks of turf. This will accomplish a finer more consistent soil sub-grade, allowing Mr. Dye the freedom to recreate his signature features including fairways, mounding, bunkers, tees and greens. Without eradication, shaping the soil with earthmoving equipment would be like trying to get the lumps out of a freshly made casserole of whipped mashed potatoes that haven’t been blended throughly and need more milk… impossible.  In addition, having the soil sub-grade free of large impediments will allow MacCurrach Golf Construction an unobstructed new canvas to work from. Accurately measuring and manipulating the soil to the specific elevations (+/- 1 inch) calculated by the engineering firm will be critical in achieving “positive drainage”, one of the main goals and objectives of the project.

The second reason for the eradication phase is the most critical. In June of 2014, after the dirt work of the restoration project is completed and all the fairways, mounding, bunkers, tees and greens have been shaped; the course will be ready to receive new turfgrass. The turf that has been selected to plant is called Celebration Bermudagrass, the latest and greatest in turfgrass genetics. The Celebration turf has been extensively tested at The Ford Plantation golf course for the last four years. The performance results, both scientific and subjective, have exceeded our expectations in most all critical categories of the evaluation parameters. Highlights of those conclusions include the facts that the Celebration turf requires less sunlight and less water than our previous turf. In addition, the turf has also exhibited an aggressive ability to crawl over the landscape, resulting in full turfgrass coverage and the ability to compete with other unwanted turfs. Genetically modified turfs are preferred (especially in the golf market) for their high shoot density which allows them to combat weed incursion and makes them less susceptible to other pest and diseases. Finally, their short, erect leaves have an innate ability to be manipulated by superintendents to create superior golf ball “lies”, making them a perfect fit for Ford.  The Celebration Bermudagrass has truly become the grass of choice in the Southeast region.


However, creating a monoculture of bermudagrass outside of a laboratory has challenged golf course superintendents and sod farm producers since the inception of Hybrid Bermudgrass in the early 1950’s. Off-types of bermudagrasses, generally referred to as “common bermudgrasses” or seeded varieties, are the culprits creating the significant challenge of managing a pure stand of hybrid bermudagrass turf. These adaptive turfgrasses have the ability to grow from rhizomes deep in ground like the hybrids, but also have the ability to grow from seed, unlike the hybrid bermudgasses that are sterile and can only reproduce vegetatively. This makes the Common bermudagrass very difficult to kill. Nonetheless, they are undesirable due to their susceptibility to pest, disease and inability to tolerate low mowing used in modern golf course management practices. Eradicating these invasive turfgrasses at the height of the growing season (summer) is critical to the success of the program. Because these turfgrasses can reproduce multiple ways, they are particularly tricky to deal with. Therefore, by spraying herbicides designed to kill bermudagrass down to the roots, we expect 97% - 99% control of the “Common”. By killing the Common bermuda now and then executing a June planting of the aggressive Celebration turf in 2014, we expect the new turf to out compete the old during the establish process known as the “grow-in”. The Celebration turf’s ability to compete for real estate, water and nutrients, make it an ideal adversary to the Common that consumes much of The Ford Plantation today. Performing the bermudgrass eradication phase before construction begins is critical. The less of the old grass growing on the ground in the summer of 2013, the better the odds are that the new grasses planted in 2014 will not be contaminated by the Common.  

Friday, December 30, 2011

Winter Weather Alert

After weeks of blue skies, warm weather and temperatures that have made it unnecessary to cover our greens, winter has finally arrived at The Ford Plantation.

During the week of January 2-5, 2011 (Monday-Thursday), the golf course maintenance department will be covering the P.G. and front nine putting greens due to night time temperatures between 25 and 38 degrees. The covering process will begin at 3:00 PM each day on #1 and will go in order from there.

Remember that the back nine will be OPEN for play even if the front nine covers have been secured. All covers will be removed the following morning as soon as the frost has lifted, typically between 9:00 and 9:45 AM.  

Please see our previous blog (Covering Process to Begin Soon, December 3, 2011) on importance of covering greens, why we do this process, and how we do it.

Thank you in advance for your help next week. If you have any questions or concerns about our covering process please feel free to contact the Pro shop, CW Canfield or Nelson Caron.

#5 cover has been secured.

Monday, August 8, 2011

Reminder: Greens Aerification Next Week!

We will be aerating our putting greens Monday, August 15-18, 2011. This will be our last time to punch holes this year.


The front nine will be closed on Monday and Tuesday with the back nine still open for play. The back nine will be closed Wednesday and Thursday with the front nine back open for play. These "flex" days in aeration allow us to get our work done faster and more efficiently.
Thank you for your cooperation and as always please contact Nelson or CW with any questions you may have.

Sunday, June 26, 2011

Fairway and Greens Aeration Dates Rescheduled

Due to a tournament cancellation we have moved our next greens aerification up from July 19, 2011 to July 11, 2011. Subsequently, fairway aerification is also moved up to July 18th from July 25th. So if you plan to make a visit to the Club this summer to play golf, make sure to call the Golf Shop for the latest update on course conditions and closures.

During the aerification process at least one nine will be open for play. Call the pro shop for details.

Thursday, March 31, 2011

Important Agronomic Activity and Tournament Dates

As a reminder, if you plan to make a visit to the Club this summer to play golf, make sure to call the Golf Shop for the latest update on course conditions and closures. We try our best to stay on a strict agronomic schedule but inclement weather can cause delays or rescheduling.

The following dates are major golf maintenance activities that will be disturbing to your golf rounds. Fortunately, like in years past, we will not shut the course down for aerations of the greens and fairways (we will have one 9 shut down per day). That means you can still come play during those weeks. However, playing conditions and green speed expectations should be adjusted under these disruptive circumstances.     

Greens Core Aeration Schedule:
Aeration 1:  The week of May 16, 2011
Aeration 2:  The week of July 19, 2011
Aeration 3:  The week of August 15, 2011

Fairway Core Aeration Schedule:
Aeration 1:  The week of May 30, 2011
Aeration 2:  The week of July 25, 2011

Tournament Dates:
Hook and Slice: April 29
American Cancer Society: June 24
Southeast Junior: June 28
Georgia PGA: July 18

Wednesday, May 26, 2010

The Ford Plantation Agronomy Blog
Welcome to The Ford Plantation Agronomy Blog Spot presented by Director of Golf Course Maintenance, Nelson Caron. Feel free to navigate the blog and get caught up on the most current golf course maintenance practices and latest course conditions.

Major Scheduled Maintenance:


May 17-21, 2010...

Front 9 Greens Core Aeration
Front 9 Greens Soil Profile Amendment Rehabilitation Project

May 24-28, 2010...
Back 9 Greens Core Aeration
May 31-June 4, 2010...
Detailed attention to growing aeration holes on greens "back-in". Also to include greens topdressing to promote a smoother surface over aeration holes.
June 7-11, 2010...
Fairway Aeration
Tim Liddy, Golf Course Architect, from Pete Dye Designs here at Ford to meet with T&H Engineering Firm
Rough Scalping and Topdressing


Above: A quick aeration video

Current Course Conditions
Greens:
The greens aeration is complete on the front nine and back nine. So we now start the healing process of the aeration holes. I expect the greens to recover with in the next 2 weeks and reestablish smooth fast putting surfaces you all are accustom to by day 17. We can expect the front 9 greens to heal faster since they were aerated before the back nine.

Rest of course: fairways, tees and rough:

The fairways, tees and rough are playing very well right now. The bermudagrass is really enjoying this warm weather. The course is playing firm and fast due to the lack of rainfall this month. Tee balls hit with the driver are rolling a long way out...

Areas of Concern:
Due to the lack of rainfall, Lake Dye (the irrigation lake) is low. Therefore, to compensate we have reduced or completely eliminated watering large areas of turfgrass to conserve water. If the turfgrass becomes endangered of going through insurmountable stress, we will irrigate as necessary to keep the grass alive. So far, there is absolutely no danger of losing too much water or turf for that matter, but we will be cautious. It is summer time here in Savannah, so evening rain storms are inevitable... we just hope to get hit a few times to fill the lakes. This is the complete opposite of the wet winter we just went through.

Upcoming Golf Events Calendar

June 25, 2010...


American Cancer Society Tournament


June 29, 2010...


GA Golf Association Golf Tournament
Recent Project Update: Front 9 Greens Soil Amendment Rehabilitation Project


Before my arrival here at Ford, major turfgrass loss on the front 9 putting greens was experienced due to the turfgrass disease known as "Fairy-ring". Fairy-ring is a very troubling turf disease and occurs all over the country, especially here in the southeast. Once golf course putting greens get infected with Fairy-ring (FR) it is difficult to rid the putting surfaces of them.

After experiencing total turf death on portions of the front 9 greens the staff in 2007 decided to resod the infected areas. Today, the FR is under control in these areas but we still suffer turf decline in the exact same spots. After further investigation, it was clear why. When the 2007 staff replaced the sod on the greens they placed a bunker sand under the sod to level it with the rest of the existing green. This caused an immediate layering issue in the soil profile... a big problem when considering a sand based green composition and water infiltration. In short, the sand that was placed under the sod for leveling was not ideal for turf growth being mowed at putting green height... therefore we experienced decline.
The solution was then a simple decision, although a difficult labor intensive one. My staff had to excavate the unwanted material (the bunker sand under the existing sod) and replace it with a proper greens profile sand mix suitable for turf growth at putting green mowing heights. This was a big project and we are finally finished. The end results are encouraging and my staff will focus on establishing and growing these areas to the high putting greens standards our members have grown to enjoy. Here are some pictures of the project:









Pictured here is a perfect example of the layering issue caused by using 2 different types of sand in the greens profile. Notice the white bunker sand in the middle of this soil core.










Pictured here is a soil core sample taken from a green that was not patched with sod. This is what it should look like. Notice the grass growing on top of nice diluted greens mix.











Here we see the men and equipment needed to remove the front of # 6 green.











Notice in this slide, the white bunker sand on the left after the old sod has been removed and the bunker sand exposed. Also notice the original desired greens mix (yellow) on the right.





















Here the men apply a new desirable mix after removing the contaminated mix. We used a certified soil laboratory in the Northeast to verify that our local sand producer could blend a sand that matched our original greens mix as close as possible.








The next step was to blend the new mix with the old not encounter any layering. We used a rotto-tiller and the result was desirable. Here we see the old and new on its way to being blended.






A great deal of skill and care is required to lay the new putting green sod.