Kyle Johnson, our course superintendent has the GCM staff running on all cylinders. The fairway Summer topdressing program has begun and phase 1 is near completion. |
The result of the dryject is seen here. The tear drop white sand demonstrates the machines ability to inject sand into the profile with minimal disruption. |
The baby gators are getting more brave as the temperatures warm. This little guy was caught running across #10 fairway towards the wetlands. |
Smiling Ben on the fairway vertical mower |
Levi vertical mowing the 11th green |
First Assistant Dane Alexander is leading the GCM Staff through drainage enhancements at 8 and 9 tee. These teeing grounds should play much firmer once the work has been completed. |
Armin and Randy Double cutting the green with the brush attachment in lowered position |
The littoral shelf at 7 is maturing well |
Iris, Pickerel weed and Spadderdock were planted 10 months ago on this site |
Just last week, more pickerel weed was planted on the shelf to bolster the appearance near the 7th green. |
The Grounds department with some help from the GCM staff also added some new plantings at parking area that was created during the course construction project. This picture is a before shot. |
150 azaleas were planted in this location to give the berm a more low country feel. The after pictures look great. |
In addition, azaleas were also planted in between the parking area and Practice facility to enhance the landscape. |
Finally, the Grounds staff made some improvements to the Welcoming Building at the club. Fresh grass was laid which really makes a great first impression. |
No comments:
Post a Comment