| Shaping occurring at #2 green complex. |
| Assistant Superintendent, Dane Alexander, standing next to previous 60" lake connector on #2. |
| Earthwork occurring on #3 fairway. |
| On the right, waste bunker development has started. |
| Tee complex development at #10. |
| #18 green being prepared for drainage installation. |
| A closeup of the proposed drainage lines on #18 green. |
| Irrigation installation occurring at #10 green. |
| The irrigation main line being installed at golf hole #11. |
| An "In the Trench" view of the irrigation main line installation. |
| A beautiful view down #12 golf hole. |
| Green-side bunker development at #15 green complex. |
| #14 tee complex in the foreground with #13 green in the background. |
| A panoramic view of #13 and #14 golf holes. |