The drainage project on #10 and #16 is complete and performing well. The new drainage systems will aid in reducing plant and soil saturation by reducing excess water and prolonged leaf wetness in the areas it was installed.
First Step: Removing Sod |
Second Step: Trenching Drainage Lines |
Third Step: Drainage Trenches Ready for Sand |
Forth Step: After Installing Drain Lines Sand is Added |
Fifth Step: Prepping Drain Lines for Sod |
Drainage Project Completed |
No comments:
Post a Comment